
In addition to fully automatic function and running-in tests, each module is subjected to manual inspection.
Visual inspection
|
Cleanliness |
Compilation |
Function test
Computer-controlled and monitored
Fully automatic calibration
Test parameters
Overload up to +80%
Output overload up to +100%
Test duration 24 - 50 hours
Temperature cycles between 0 °C and 60 °C
Documentation
| Serial number |
Measurement data |
All product, test, delivery, repair and service data is stored centrally in a data bank to enable immediate and complete tracing of the product history.
Production data
Type number, series number, type specification, data of manufacture, test status, version
Test data
Production test and run-in
Date, temperature cycles, duration, air humidity, test stages, test results, calibration data, firmware type, hardware type, measurement data, faults, tolerances, voltage overload/underload limits
Delivery data |
Customer number, delivery data |
Repair data |
Customer number, fault description, fault, update |
Service data |
Customer number, receiving data, service response |
These documentation features enable all modules that were manufactured since 1983 to be identified and the production, test, sales and service data to be instantly reproduced.